The biggest cause of build delays is undoing work you've already finished. Follow our proven 10-stage sequence to build faster and smarter.
01
Prep & Windows
- Strip interior
- Rust treatment
- Cut window holes
- Install roof vents
02
Technical First Fix
- Run electrical looms
- Gas pipe runs
- Water pipe runs
- Solar cable entry
03
Insulation
- Sound deadening
- Thermo liner
- Cavity filling
- Vapor barrier sealing
04
Structural Framing
- Floor battens
- Wall framing
- Ceiling ribs
- Bed platform structure
05
Flooring & Lining
- Insulated floor
- Wall panels
- Carpet lining
- Ceiling cladding
06
Furniture Build
- Kitchen carcass
- Seating boxes
- Overhead lockers
- Wardrobes
07
Second Fix Systems
- Appliance install
- Tap & sink hookup
- Battery bank wiring
- Heater connection
08
Finish & Trim
- Door handles
- Lighting fixtures
- Soft furnishings
- Edge trimming
The Golden Rule: Looms First
The single biggest mistake builders make is insulating and cladding before running their electrical looms. You must have every wire for every light, socket, and appliance in place before the insulation goes in.
PRO TIP: Always run 'pull strings' or spare conduits in your walls. If you decide to add a camera or a new light later, you'll thank yourself.