Build Sequence
// THE ROADMAP

THE
RIGHT
ORDER

The biggest cause of build delays is undoing work you've already finished. Follow our proven 10-stage sequence to build faster and smarter.

01

Prep & Windows

  • Strip interior
  • Rust treatment
  • Cut window holes
  • Install roof vents
02

Technical First Fix

  • Run electrical looms
  • Gas pipe runs
  • Water pipe runs
  • Solar cable entry
03

Insulation

  • Sound deadening
  • Thermo liner
  • Cavity filling
  • Vapor barrier sealing
04

Structural Framing

  • Floor battens
  • Wall framing
  • Ceiling ribs
  • Bed platform structure
05

Flooring & Lining

  • Insulated floor
  • Wall panels
  • Carpet lining
  • Ceiling cladding
06

Furniture Build

  • Kitchen carcass
  • Seating boxes
  • Overhead lockers
  • Wardrobes
07

Second Fix Systems

  • Appliance install
  • Tap & sink hookup
  • Battery bank wiring
  • Heater connection
08

Finish & Trim

  • Door handles
  • Lighting fixtures
  • Soft furnishings
  • Edge trimming

The Golden Rule: Looms First

The single biggest mistake builders make is insulating and cladding before running their electrical looms. You must have every wire for every light, socket, and appliance in place before the insulation goes in.

PRO TIP: Always run 'pull strings' or spare conduits in your walls. If you decide to add a camera or a new light later, you'll thank yourself.